4 things to check before you hire a contractor

Most remodeling problems have nothing to do with the finishes. They start long before the tile goes in: an incomplete bid, a missing plan, unqualified tradesmen, or no one running the job.

We've seen these happen to homeowners and business owners alike, on projects of every size. The good news is that most of them are preventable if you know what to look for before you sign. Here are the four problems we see most often, why they happen, and how to protect yourself, whoever you hire.

Great spaces are planned long before construction begins.

1. The low bid that grows

What goes wrong: Two bids for the same project can look like they cover the same work when they don't. It's easy to focus on the bottom number instead of the details. To win the job, a low bid often leaves out the parts of the work that are hardest to see on paper: project management, general labor, fire blocking, and proper procedures.

When project management is left out, the homeowner usually ends up communicating with the trades and vendors themselves. Without a system to track the order of operations and the timeline, work happens out of order and has to be done twice.

Basic home protection gets cut too: covering floors, setting up dust barriers, and keeping a clean, organized job site. Most trades, like electricians and plumbers, don't include cleanup in their pricing, so the homeowner is usually left with the mess. Those costs don't go away. After you've already committed, they come back as change orders, or as a chaotic job site where trades work less efficiently or walk off the job.

How to prevent it: Look for one estimate, organized by trade, that includes labor hours for skilled, experienced people in project management and general labor, proper home protection and cleanup, and verified subcontractors, all included up front. If two bids are far apart, line them up trade by trade and ask what each one leaves out.

On larger projects, ask who the dedicated project manager will be. When a contractor is wearing too many hats at once, running crews, selling the next job, and managing yours, delays are almost guaranteed.

Comparing bids now? Read How to compare remodeling estimates fairly.

2. Pricing before there's a plan

What goes wrong: Many projects grow into something bigger once work starts, especially when there are surprises behind the walls: outdated electrical, old plumbing, or rotted wood. If the price was built on assumptions, each surprise becomes a budget problem.

A common one is assuming something will cost a certain amount, only to find it costs far more. A few of those assumptions together get expensive quickly. And an allowance in a bid doesn't cover a real code issue that has to be updated or repaired once it's found. These changes turn into budget surprises halfway through the job.

Small ideas can carry big costs. Removing a wall sounds simple, but if it's load-bearing and the plumbing and electrical inside it need to be rerouted, that one change can add $20,000 to $30,000.

How to prevent it: Complete your plans and finish selections as much as possible before pricing, so the number reflects what will actually be installed. Plan for the unexpected instead of assuming it won't happen, and ask the contractor what they've seen go wrong on homes like yours. Before you commit to an idea like moving a wall, get it priced with the structural, plumbing, and electrical work included.

More on this in Plan first, build second.

3. Poor management

What goes wrong: Some jobs have no designated project manager. Sometimes a homeowner or business owner without the experience tries to take on the role themselves. Other jobs have one, but the homeowner assigns tasks directly to a crew without going through the proper channels, and the project manager never hears about it.

Either way, the results look the same. Trades show up out of order, days get lost, and changes in the field that affect other trades get missed. Steps get skipped and things have to be redone. The project goes over budget and can take twice as long.

How to prevent it: Make sure one person or team schedules every trade and is your single point of contact. That team should watch for conflicts where trades share space, like plumbing, electrical, and HVAC running through the same walls and ceilings. They should make sure fire blocking happens during the correct phase of the project. For example, in some basements a fire-rated drywall layer needs to go in before framing begins. And they should keep track of all the moving parts to keep your plan on track from start to finish.

Once the job starts, route your requests and changes through the project manager, even small ones. It keeps everyone working from the same plan.

See What project management really pays for.

4. Shortcuts behind the walls

What goes wrong: Waterproofing, fire blocking, framing or structural elements, and wiring problems stay hidden until after the finishes are in. By then, fixing them means tearing out finished work.

How to prevent it: Make sure qualified craftsmen, like the team at Sueco, build it right, from the foundation to the final trim. Ask who will do the work that gets covered up, whether that's the contractor's own craftsmen or qualified partners, and how it gets checked before the walls are closed.

Questions to ask any contractor

  • Is project management included in this price, or will it be billed later?

  • Who is the dedicated project manager on my job?

  • Is this number based on finished plans and selections, or on allowances and general square-foot numbers?

  • Does the estimate include home protection like floor covering, dust barriers, and general cleanup?

  • Who schedules the trades and keeps me updated?

  • Who builds the parts of the job that get covered up, and how is that work checked?